Temporary Service | 3/3/2017 | 3/3/2017 | 3/3/2017 | A | PASS |
Eric Story
|
|
|
Overhead temporary powerpole Phone #: ###-#### Inspection requested via web by Rick Beckman Corrections fixed t/s o/h rec ok
|
Temporary Service | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | FAIL |
Rock A. Hudson
|
|
|
overhead temporary power pole Phone #: ###-#### Inspection requested via web by Rick Beckman 230.24(B)- Vertical clearance for overhead service entrance conductors shall be 10' minimum. Pole measures 9 1/2' and drip loop would be lower.
|
Issue PAID IN FULL permit | | | 2/27/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/27/2017 | | DONE |
|
|
|
This permit was created on the web by Rick Beckman
|