Print Statement | | | 6/15/2017 | | DONE |
|
|
|
|
Final | 4/26/2017 | 4/27/2017 | 4/27/2017 | A | PASS |
Eric Story
|
|
|
Building will be open after9:00 am Phone #: ###-#### Inspection requested via web by Steve Craig Final ok
|
Electrical Rough-In | 3/27/2017 | 3/28/2017 | 3/28/2017 | A | PASS |
James Ady
|
|
|
Corrections have been made Phone #: ###-#### Inspection requested via web by Steve Craig Corrections made Rough in ok
|
Electrical Rough-In | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | FAIL |
James Ady
|
|
|
Cover inspection before sheetrock Phone #: ###-#### Inspection requested via web by Steve Craig 310.15 B3 Adjustment factors required for more than 9 current carrying conductors. Too many cables in stud knock outs. Loose MC connector on neighboring unit recep. West wall.
|
Electrical Rough-In | 3/8/2017 | 3/9/2017 | 3/9/2017 | A | PASS |
Rock A. Hudson
|
|
|
Underslab inspection Phone #: ###-#### Inspection requested via web by Steve Craig Rough in ok cover
|
Issue PAID IN FULL permit | | | 3/8/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/8/2017 | | DONE |
|
|
|
This permit was created on the web by Steve Craig
|
First Notice | 4/27/2017 | 4/27/2017 | | | |
Eric Story
|
|
|
|