Final | 12/6/2017 | 12/7/2017 | 12/7/2017 | A | PASS |
James Ady
|
|
|
Final on Solar questions please call Logan ###-#### Phone #: ###-#### Inspection requested via web by Paula Gietzen corrections made final ok
|
Final | 12/4/2017 | 12/5/2017 | 12/5/2017 | A | PART |
James Ady
|
|
|
Final on solar Phone #: ###-#### Inspection requested via web by Paula Gietzen Bond j-box in electric room, Label main disc. as "Line and Load May Be Energized" , Install abrasion protection in J-box in maintenance room, Replace ground box with proper electrical ground box. Partial final only
|
Final | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | NR |
James Ady
|
|
|
Ready for Final on solar Phone #: ###-#### Inspection requested via web by Paula Gietzen
|
Electrical Rough-In | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
James Ady
|
|
|
Ready for Final on solar Phone #: ###-#### Inspection requested via web by Paula Gietzen Underground from building to meter buried without inspection. Verified depth thru pictures
|
Electrical Rough-In | 10/16/2017 | 10/16/2017 | 10/16/2017 | P | PASS |
Rock A. Hudson
|
|
|
Rough In Inspection Solar Array Phone #: ###-#### Inspection requested via web by Paula Gietzen Listing confirmed rough in ok
|
Issue PAID IN FULL permit | | | 5/4/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/4/2017 | | DONE |
|
|
|
This permit was created on the web by Paula Gietzen
|
First Notice | 12/7/2017 | 12/7/2017 | | | |
James Ady
|
|
|
|