Final | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | PASS |
Eric Story
|
|
|
GFCI/TP receptacle installed for washer machine late PM if possible 3:00 ish Steve ###-#### Corrections fixed final ok
|
Final | 4/16/2019 | 4/17/2019 | 4/17/2019 | P | FAIL |
Eric Story
|
|
|
Contact person Steve ###-#### Please call when in route; Phone #: ###-#### 210.8 All 120V recetpacles located within a bathroom shall have GFCI protecion
|
ELE-Aging Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 | | DONE |
Daryl DeGrange
|
|
|
Final inspection scheduled for PM 4/17/19
|
Conference | 5/9/2017 | 5/10/2017 | 5/10/2017 | A | DONE |
Eric Story
|
|
|
Steve Phone #: ###-#### Conference was done on a MIS permit, discussed wiring of new bath
|
Electrical Rough-In | 5/10/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Eric Story
|
|
|
Steve Phone #: ###-#### Back bath ok cover
|
Application received | | | 5/9/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/9/2017 | | DONE |
|
|
|
|