Final | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Daryl DeGrange
|
|
|
Temp power for crane Final ok
|
Electrical Rough-In | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | CANC |
James Ady
|
|
|
Contact Tony Keen if needed to inspect east half of slab pour Lower Level 3 in concrete raceways. Phone #: ###-#### Inspection requested via web by Tom Betty Wrong permit called in. Should have been ele17-01400
|
Electrical Rough-In | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
James Ady
|
|
|
Call Tony for inspection of tower crane feed from temporary power panel. Phone #: ###-#### Inspection requested via web by Tom Betty Temp power to crane only ok
|
Issue PAID IN FULL permit | | | 5/24/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/24/2017 | | DONE |
|
|
|
This permit was created on the web by Cathy Duchek
|
First Notice | 4/2/2019 | 4/2/2019 | | | |
Daryl DeGrange
|
|
|
|