ELE-Aging Inspection | 4/25/2019 | 4/25/2019 | 4/25/2019 | | PASS |
Daryl DeGrange
|
|
|
see final
|
Final | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Daryl DeGrange
|
|
|
job complete, final ok
|
Electrical Rough-In | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | CANC |
Mark Moncarr
|
|
|
Should be a perm. underground - Greg Phone #: ###-####
|
Permanent Service | 6/20/2017 | 6/21/2017 | 6/20/2017 | A | PASS |
Mark Moncarr
|
|
|
Greg Phone #: ###-#### p/s u/g n ok. Howeowner was waiting for IDP to see how they wanted to route wires in Looked at service on 6/20/17
|
Conference | 6/12/2017 | 6/14/2017 | 6/14/2017 | A | DONE |
Mark Moncarr
|
|
|
Greg Phone #: ###-#### Discussed changing from overhead to underground service. IDP was ok with customer reducing the conduit size from 2" to 1 1/4" into bottom of existing meter. If not, homeowner would have to replace meter with WP hub on top to re-feed inside panel.
|
Application received | | | 6/12/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/12/2017 | | DONE |
|
|
|
|