Final | 9/12/2017 | 9/13/2017 | 9/13/2017 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Corrections for poool issues fixed Final ok No card on site to sign
|
Electrical Rough-In | 9/12/2017 | 9/13/2017 | 9/13/2017 | A | PASS |
Eric Story
|
|
|
E grid Phone #: ###-#### Inspection requested via web by Lee VanSchoiack E/Q potential around pool perimeter ok cover
|
Final | 9/8/2017 | 9/8/2017 | 9/8/2017 | A | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack 680.21 240v pump for pools shall have GFCI protection 680.22 receptacle required within 20' of pool edge 680.21 240v pumps for pools shall have GFCI protection 680.26 EQ bond required for pools
|
Electrical Rough-In | 7/7/2017 | 7/7/2017 | 7/7/2017 | A | PASS |
James Ady
|
|
|
bonding Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Corner bond only ok
|
Issue PAID IN FULL permit | | | 7/7/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/7/2017 | | DONE |
|
|
|
This permit was created on the web by Lee VanSchoiack
|