Final | 10/12/2017 | 10/12/2017 | 10/12/2017 | A | PASS |
Mark Moncarr
|
|
|
After 9am Phone #: ###-#### Inspection requested via web by Travis Nichols Ok final.
|
Electrical Rough-In | 8/24/2017 | 8/25/2017 | 8/25/2017 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Travis Nichols Ok cover. Boxes will not be flush with finish work. Talked to homeowner about using spark rings at all locations.
|
Electrical Rough-In | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | NR |
Mark Moncarr
|
|
|
Travis-as early as possible Phone #: ###-#### Going to call in for AM on 8/25/17
|
Conference | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | DONE |
Mark Moncarr
|
|
|
Travis Phone #: ###-#### Discussed wire size for 6-12 panel to small shop, along with location of panel. All conduit as per NEC. Panel is going to have 1 30a 2 pole for in wall heater, and 2 single pole 20's for various receps and lights.
|
Application received | | | 8/8/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/8/2017 | | DONE |
|
|
|
|