Final | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | PASS |
James Ady
|
|
|
Jade Phone #: ###-#### Final ok
|
Electrical Rough-In | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | PASS |
James Ady
|
|
|
Jade Phone #: ###-#### Spot holes dug to verify conduit depth. Rough in ok.
|
Final | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | FAIL |
James Ady
|
|
|
call for access information - Caleb Phone #: ###-#### spot check holes need dug to verify conduit depth as per D Degrange.
|
Application received | | | 8/9/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/9/2017 | | DONE |
|
|
|
|
First Notice | 8/17/2017 | 8/17/2017 | | | |
James Ady
|
|
|
|