Final | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | PASS |
Eric Story
|
|
|
Ron Phone #: ###-#### Final for solar array install ok
|
Electrical Rough-In | 8/30/2017 | 8/31/2017 | 8/31/2017 | A | PASS |
Eric Story
|
|
|
Please call ahead if before 9AM - Ron Phone #: ###-#### Owner will call for another inspection once solar array install is complete to verify all work. Material is U/L listed......
|
Conference | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | DONE |
Eric Story
|
|
|
Requests around 10AM, Please call ahead for access - Ron Phone #: ###-#### Discussed solar array install, will need a rough-in inspection once material is on site and will have more of a game plan to verify install..
|
Application received | | | 8/21/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/21/2017 | | DONE |
|
|
|
|