Final | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Tom Saunders
|
|
|
I will meet you there with the same Panel and optimzers that we use on the roof to show the UL Listings. Phone #: ###-#### Inspection requested via web by Jesse Simpson...
labelling, ocpd, and disconnect...ok to final
|
Electrical Rough-In | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Tom Saunders
|
|
|
I will meet you there with the same Panel and optimzers that we use on the roof to show the UL Listings. Phone #: ###-#### Inspection requested via web by Jesse Simpson...
listed equipment...ok
|
Final | 9/6/2017 | 9/7/2017 | 9/7/2017 | A | FAIL |
Tom Saunders
|
|
|
Please contact Rob Kelley ###-####, our lead installer, so that he can meet you for the inspection. Phone #: ###-#### Inspection requested via web by Jesse Simpson...
as per Boise City ordinance a rough inspection must be called in first before a final inspection can be scheduled....contractor has been made aware of multiple times...contractor will need to be at inspection with ladder or equipment on the ground to verify listing
|
Application received | | | 8/22/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/22/2017 | | DONE |
|
|
|
|