Final | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Eric Story
|
|
|
key is in weather proof on left side of carport. Phone #: ###-#### Inspection requested via web by Eric Brown Corrections fixed final ok
|
Final | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | FAIL |
James Ady
|
|
|
key is in weather proof box on left side of carport. Phone #: ###-#### Inspection requested via web by Eric Brown 210.8A5 Down living shall be GFCI protected. 408.4 Panel shall be Accurately labeled. Front up bed, Receps on exterior wall are dead.
|
Final | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | NH |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown No access. Talked to Eric, going to re-schedule for tomorrow.
|
Electrical Rough-In | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
James Ady
|
|
|
Floor heat inspection for master bath. Please call Eric with any questions or concerns. Thanks Phone #: ###-#### Inspection requested via web by Eric Brown Master floor heat only ok to cover
|
Rough-In Permanent Service | 9/21/2017 | 9/21/2017 | 9/21/2017 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown Check for UFER access panel on final. Was told it will be in cabinet or pantry on final. Corrections made. Rough in ok p/s u/g n ok
|
Rough-In Permanent Service | 9/20/2017 | 9/20/2017 | 9/20/2017 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown Weather proof receptacle boxes not in, Allied pan boxes living ceiling and up bath light, Nail plates needed basement and main level, Basement to be insulated but unfinished.
|
Electrical Rough-In | 8/31/2017 | 9/1/2017 | 9/1/2017 | P | PASS |
James Ady
|
|
|
Soffit inspection for cover only Phone #: ###-#### Inspection requested via web by Eric Brown Soffits only ok to cover
|
Issue PAID IN FULL permit | | | 8/31/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/31/2017 | | DONE |
|
|
|
This permit was created on the web by Eric Brown
|