Final | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PASS |
Mark Moncarr
|
|
|
Ok final.On N wall in kitchen, there was a 3 piece granite install. Granite was removed and changed to one single piece on entire. Prior to install of 3 piecle granite, all kitchen boxes were shaved off 1/2" because granite stuck out to far. I talked to the electrician and he went to the job and changed out all boxes. Home was staged, could not get to all recepts to test.
|
Final | 11/29/2017 | 11/30/2017 | 11/30/2017 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Perez Re-scheduled for 12/1/17
|
Electrical Rough-In | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | PASS |
Mark Moncarr
|
|
|
Floor Heat Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover floor heat upstairs, mudroom, and mstr bath.
|
Electrical Rough-In | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Mark Moncarr
|
|
|
Garage rough in for cover Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover. Will need to see a disconnect at garage as there is more than 1 branch circuit. If 3 circuits, it will need to be a 60a minimum panel with 1 grd rod.
|
Electrical Rough-In | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Mark Moncarr
|
|
|
Please call Tom with any questions or concerns. ###-#### Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover house only. Will need to see 2 floor outlets upstairs upon final.
|
Electrical Rough-In | 10/10/2017 | 10/11/2017 | 10/11/2017 | P | NR |
Mark Moncarr
|
|
|
Please call Tom B. Phone #: ###-#### Inspection requested via web by Kevin Perez
|
Electrical Rough-In | 10/5/2017 | 10/10/2017 | 10/10/2017 | P | CANC |
Mark Moncarr
|
|
|
Call Tom Bunting for any questions or concers Phone #: ###-#### >> Inspection requested via web by Kevin Perez Inspection cancelled from web by: Kevin Perez
|
Conference | 9/19/2017 | 9/19/2017 | 9/20/2017 | P | DONE |
Mark Moncarr
|
|
|
Possibly start ele work without bld being issued Bldg permit must be issued prior to any elec work being done. Review for bldg permit is still under review, awaiting more structural information.
|
Permanent Service | 9/13/2017 | 9/14/2017 | 9/14/2017 | A | PASS |
Eric Story
|
|
|
Please call Tom with any questions Phone #: ###-#### Inspection requested via web by Kevin Perez p/s o/h rec ok
|
Issue PAID IN FULL permit | | | 9/6/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/6/2017 | | DONE |
|
|
|
This permit was created on the web by Kevin Perez
|