Final | 10/2/2017 | 10/3/2017 | 10/3/2017 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by todd cline Corrections fixed final for solar array ok
|
Final | 9/27/2017 | 9/27/2017 | 9/27/2017 | P | FAIL |
Eric Story
|
|
|
solar panel installation with disconnects and labeling Phone #: ###-#### Inspection requested via web by todd cline 210.8 all receptcles in a garage shall have GFCI protection 690 disc for solar array shall be red lettering and reflective
|
Final | 9/21/2017 | 9/22/2017 | 9/22/2017 | A | FAIL |
Eric Story
|
|
|
solar power system is ready for a final inspection Phone #: ###-#### Inspection requested via web by todd cline No BLD issued for solar array system
|
Issue PAID IN FULL permit | | | 9/12/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/12/2017 | | DONE |
|
|
|
This permit was created on the web by todd cline
|