Permit Information
Permit NumberELE17-03193
StatusFinaled
Name PELLETIER CARL A
Site Address 4309 W CASSIA ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Homeowner Online - Alteration or Repair: Install Standby Generator
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/18/201810/18/201810/19/2018PPASS
DetailsEric Story
Backup Generator installed Generac service complete and ready for demonstration of generator function and automatic transfer switching operation
Final instalation permit inspection requested. Phone #: ###-#### Inspection requested via web by Carl Pelletier
Final ok
ELE-Request for Extension10/2/201810/2/201810/2/2018PDONE
DetailsEric Story
Request 30 day extension to allow for appointment with Generac service technition for generator install and setup endorsement, Boise City final inspection to be scheduled on a following date. Phone #: ###-#### Inspection requested via web by Carl Pelletier
30 Day extension given for generator start up testing
Rough-In Permanent Service9/24/20189/25/20189/25/2018PPASS
DetailsEric Story
Idaho Power disconnect appointment 11AM-12PM Tuesday. Request inspection of utility service rough-in for permanent service 12PM-3PM. Idaho Power to re-connect service same day. Phone #: ###-#### Inspection requested via web by Carl Pelletier
p/s o/h rec ok
ELE-Request for Extension9/5/20189/6/20189/6/2018PPASS
DetailsJames Ady
Request for 30 day extension to coordinate service connection, Generac technician appointment to establish settings, and final inspection Phone #: ###-#### Inspection requested via web by Carl Pelletier Request for extension ok
Conference8/28/20188/29/20188/29/2018PPASS
DetailsEric Story
Rock Hudson, Questions about a standby generator with not separately derived system connection to integrated utility service panel. Carl Phone #: ###-#### Inspection requested via web by Carl Pelletier
Discussed termination points for generator hook up in Idaho Powers side
ELE-Request for Extension3/13/20183/13/20183/13/2018PPASS
DetailsEric Story
My original permit expiration is coming up on 3/17/18, my most recent inspection was 2/12/18 and I am making progress on completion of this permit, I would like to request an extension of time on this permit, and confirm that acceptance. Phone #: ###-#### Inspection requested via web by Carl Pelletier
180 day extension given
Electrical Rough-In2/9/20182/12/20182/12/2018PPASS
DetailsEric Story
Review underground prep work from generator to house for "stand by generator installation", trenching ; electrical conduit rough-in work, Sch.80 required where emerge from grade. Discussed generator location shall have a min of depth of 36" for work space at generator disconnect. Phone #: ###-#### Inspection requested via web by Carl Pelletier
Remaining U/G for generator ok to cover
Conference10/7/201710/9/201710/9/2017PDONE
DetailsRock A. Hudson
Introduction and review underground prep work for stand by generator instalation, trenching ; electrical conduit rough-in work Phone #: ###-#### Inspection requested via web by Carl Pelletier
Discussed generator location shall have a min of depth of 36" for work space at generator disconnect. Sch.80 required where emerge from grade, grounding electrode system for each service all that needed, equipment grounds to generator each with common neutral blocks. Main disconnect for shop to remain inside and house to remain outside. Check for removal of main bonding jumper at generator in future. Will call for underground to house when ready.
Electrical Rough-In10/9/201710/9/201710/9/2017PPASS
DetailsRock A. Hudson
Introduction and review underground prep work for stand by generator instalation, trenching ; electrical conduit rough-in work Phone #: ###-#### Inspection requested via web by Carl Pelletier
Partial underground from generator to shop and corner of shop headed to house rough in ok cover
Issue PAID IN FULL permit  9/22/2017 DONE
Payment received via Govolutions
Application received  9/22/2017 DONE
This permit was created on the web by Carl Pelletier