Final | 6/19/2018 | 6/20/2018 | 6/19/2018 | A | PASS |
Mark Moncarr
|
|
|
Ben Phone #: ###-#### Ok final. Corrections made. Outlet to right of range was installed under the cabinet. I didnt see it the first time. DW is cord and plug connected behind unit. Metioned to contractor that from now on recept needs to be adjacent to cabinet for readily accessible option. Spark ring and P-8 were installed above micro. Looked at job on 6/19/18.
|
Final | 6/19/2018 | 6/19/2018 | 6/19/2018 | P | FAIL |
Mark Moncarr
|
|
|
Ben-if you can''t get in please call for access Phone #: ###-#### 1. 210.52(C)(1) countertop to right of range needs outlet added. Countertop is over 12". 2. Spark ring and P-8 needed for micro. 3. Lockout needed on DW.
|
Final | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | FAIL |
James Ady
|
|
|
call owner lawrence (call contractor if problems Ben ###-####) Phone #: ###-#### 210.52B1 Kitchen sounter shall be fed by 2 or more 20amp circuits. 210.52C1 Kitchen countertops 12in or wider shall have recep.(rt side of range)
|
Rough-In Permanent Service | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | PASS |
Mark Moncarr
|
|
|
Interior R/I & service - Lawrence Phone #: ###-#### p/s o/h n ok
|
Electrical Rough-In | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Mark Moncarr
|
|
|
Lawerence(homeowner)-if homeowner isn''t there please call Ben ###-#### for access Phone #: ###-#### Ok cover S wall of living. 2-1/2" KO seals needed top right of panel. Contractor going to send pics.
|
Electrical Rough-In | 10/31/2017 | 11/1/2017 | 11/1/2017 | A | PASS |
Mark Moncarr
|
|
|
Lawrence Phone #: ###-#### Ok cover walls and ceilings in kitch, SE bed and new mstr bath.
|
Application received | | | 9/25/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/25/2017 | | DONE |
|
|
|
|