Final | 1/30/2018 | 1/30/2018 | 1/30/2018 | A | PASS |
Mark Moncarr
|
|
|
If doors are locked call for access Phone #: ###-#### Inspection requested via web by steve sellers Ok final.
|
Electrical Rough-In | 12/3/2017 | 12/4/2017 | 12/4/2017 | A | PASS |
Mark Moncarr
|
|
|
floor heat in master bathroom, entrance from the alley and through back door, call for access if locked. Phone #: ###-#### Inspection requested via web by steve sellers Ok cover. Tile contractor was told to not cover. All but the last foot was covered. Talked to Steve, cold lead is installed in floor and not wall.
|
Electrical Rough-In | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PASS |
Mark Moncarr
|
|
|
project access through back of house Phone #: ###-#### Inspection requested via web by steve sellers ok cover
|
Issue PAID IN FULL permit | | | 10/5/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/5/2017 | | DONE |
|
|
|
This permit was created on the web by steve sellers
|