First Notice | 12/4/2017 | 12/4/2017 | 12/4/2017 | | DONE |
Tom Saunders
|
|
|
This permit finaled on the web by Garrett Collins
|
Final | 12/2/2017 | 12/4/2017 | 12/4/2017 | A | PASS |
Tom Saunders
|
|
|
Final inspection for generator and ATS. Located in back of building. I can be on site if needed. Just give me a call ahead of time. Phone #: ###-#### Inspection requested via web by Garrett Collins...ok to final
|
Permanent Service | 11/24/2017 | 11/27/2017 | 11/27/2017 | A | PASS |
Eric Story
|
|
|
ATS and gen set at back of building. All cabinets unlocked. Need ok to energize for Saturday shutdown. I will not be on site, call with questions. Phone #: ###-#### Inspection requested via web by Garrett Collins ATS and generator ok to energize p/s u/g n ok
|
Electrical Rough-In | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Daryl DeGrange
|
|
|
Underground inspection. Call with questions. Phone #: ###-#### Inspection requested via web by Garrett Collins Rough-in ok cover underground with use of dig warning tape minimum.
|
Issue PAID IN FULL permit | | | 10/5/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 10/5/2017 | | |
|
|
|
|
Application received | | | 10/5/2017 | | DONE |
|
|
|
This permit was created on the web by Garrett Collins
|