Final | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | PASS |
Mark Moncarr
|
|
|
Final on Solar Call to go over inspection if needed Logan ###-#### Phone #: ###-#### Inspection requested via web by Paula Gietzen Ok final. All labels present. 2 systems. 1 disconnect for main house installation, and 1 for garage installation. Install on house is not a line side tap. 705.12(B) Disconnect can be powered from sub panel. House solar disconnect located on W side by sub panel.
|
Electrical Rough-In | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | PASS |
Mark Moncarr
|
|
|
Rough In Inspection Solar Joey ###-#### Phone #: ###-#### Inspection requested via web by Paula Gietzen Ok cover. All componenets UL listed.
|
Issue PAID IN FULL permit | | | 10/10/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/10/2017 | | DONE |
|
|
|
This permit was created on the web by Paula Gietzen
|