Final | 11/29/2017 | 11/30/2017 | 11/30/2017 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Shawn Dulin final ok
|
Electrical Rough-In | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PASS |
James Ady
|
|
|
Please call before heading over so I can meet you there.
Thanks Shawn Phone #: ###-#### Inspection requested via web by Shawn Dulin Garage Loft Bath rough in only ok
|
Electrical Rough-In | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | NR |
James Ady
|
|
|
Please call prior to heading over so I can meet you there.
Thanks Shawn Phone #: ###-#### Inspection requested via web by Shawn Dulin Not ready. Needed conference
|
Conference | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
James Ady
|
|
|
Please call prior to heading over so I can meet you there.
Thanks Shawn Phone #: ###-#### Inspection requested via web by Shawn Dulin Talked about Dedicated 20A circuits for water heater and Bath Vanity recep. Also need lght and recep in Attic next to water heater
|
Application received | | | 10/13/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/13/2017 | | DONE |
|
|
|
|