Final | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by steve cooper Ok final. There are 2-3/0 light boxes in ceiling above tub in master bath. Light boxes DO have blank covers. Electrical contractor spoke to homeowners and said that he would not hang cord and chain fixtures over the tub. 410.10(D). Pendants or cord and chain hung fixtures need to be atleast 3ft away from inside edge of tub horizontally, and 8ft vertically. There were 2 cord and chain fixtures in the utility that were marked mstr bath. No fixtures were installed above tub when I finaled it out.
|
Final | 1/24/2018 | 1/26/2018 | 1/25/2018 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by steve cooper This was a duplicate inspection. Final was done on 1/25/18.
|
Electrical Rough-In | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by steve cooper p/s u/g n ok
|
Issue PAID IN FULL permit | | | 10/31/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/31/2017 | | DONE |
|
|
|
This permit was created on the web by steve cooper
|