Final | 12/5/2017 | 12/7/2017 | 12/7/2017 | A | PASS |
Mark Moncarr
|
|
|
David Phone #: ###-#### Ok final cans and ceiling fan back patio.
|
Electrical Rough-In | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PASS |
Mark Moncarr
|
|
|
David Phone #: ###-#### Ok cover cans and PF on patio. PF box is rated.
|
Conference | 11/3/2017 | 11/6/2017 | 11/6/2017 | P | DONE |
Mark Moncarr
|
|
|
Please call ahead for access - David Phone #: ###-#### Back porch was framed out to full size patio. Homeowner is using existing outside light switchleg to power 6 cans and 1 paddle fan. Installed a new metal Jbox as existing was damaged. Jbox has ground screw installed.
|
Application received | | | 11/3/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/3/2017 | | DONE |
|
|
|
|