ELE-Aging Inspection | 2/6/2020 | 2/6/2020 | 2/7/2020 | | DONE |
Daryl DeGrange
|
|
|
see final
|
Final | 2/7/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Daryl DeGrange
|
|
|
Inspection process completed by ELE17-03824 final ok
|
ELE-Aging Inspection | 11/6/2019 | 11/6/2019 | 11/6/2019 | | FAIL |
Mark Moncarr
|
|
|
Last inspection failed due to various corrections needed. Please schedule an inspection to verify corrections were made.
|
Permanent Service | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | FAIL |
Mark Moncarr
|
|
|
Chase Phone #: ###-#### 1. Boxes need connectors and covver in furnace room off down bathrooms. 2. Wire sticking through wall needs boxed and blanked. 3. Verify wiring in 40a disconnect behing cabinet door E stairwell. Green used as hot conductor, and verify the length and use of tap also in 40a disc. Work needs to be done by a licensed electrical contractor.
|
Issue PAID IN FULL permit | | | 11/5/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/3/2017 | | |
|
|
|
|