Final | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
James Ady
|
|
|
Bob Phone #: ###-#### Idaho power energized without Perm. Serv. inspection. Service ok Final ok
|
Final | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | NR |
James Ady
|
|
|
Robert Phone #: ###-#### not ready Need to pull seperate permit for garage and then final house
|
Electrical Rough-In | 12/18/2017 | 12/19/2017 | 12/19/2017 | A | PASS |
James Ady
|
|
|
Bob Phone #: ###-#### corrections made rough in ok
|
Electrical Rough-In | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | FAIL |
James Ady
|
|
|
Robert Phone #: ###-#### 210.11c1 and 210.11c2. Laundy and kitchen appliance circuits shall have no other receps.
|
Change Status to I | | | 12/18/2017 | | DONE |
|
|
|
Per James A, did not mean to final yet
|
Conference | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | DONE |
James Ady
|
|
|
Bob Phone #: ###-#### Talked about need for disc on detached garage, kitchen appliance circuits, Need for grounded conductor in each switch box.
|
Electrical Rough-In | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PASS |
James Ady
|
|
|
Bob Phone #: ###-#### Underground between house and garage ok to cover
|
Application received | | | 11/20/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/20/2017 | | DONE |
|
|
|
as per Daryl D-ok to issue permit to parcel owner-son will live at the house when addition is done
|