Final | 12/6/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Mark Moncarr
|
|
|
After 3 // Jason Phone #: ###-#### Ok final. Looked at on 12/6/17. A rough-in inspection was done at time of final. I talked to contractor and told them that Boise City ordinance requires a rough-in inspection before final.
|
Application received | | | 11/22/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/22/2017 | | DONE |
|
|
|
|