Final | 3/18/2018 | 3/19/2018 | 3/19/2018 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by ron spen cer corrections made final ok
|
Final | 3/13/2018 | 3/14/2018 | 3/14/2018 | P | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by ron spen cer 406.12 Offices and corridors in patient care facilities shall be tamper resistant,(areas marked on print.) 210.8 Receps within 6ft of a sink shall be gfci protected. 210.8 GFCI shall be readily accessable( Drinking fountain) Floor recep in back conference room showing open ground
|
Final | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | NR |
James Ady
|
|
|
partial final--above grid inspection Phone #: ###-#### Inspection requested via web by ron spen cer
|
Electrical Rough-In | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
James Ady
|
|
|
partial final--above grid inspection Phone #: ###-#### Inspection requested via web by ron spen cer Ceiling only ok to cover
|
Electrical Rough-In | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | PASS |
Mark Moncarr
|
|
|
floor boxes--3 conference rooms Phone #: ###-#### Inspection requested via web by ron spen cer Ok cover floor boxes. 2 NW corner, and 1 SE corner.
|
Electrical Rough-In | 12/20/2017 | 12/21/2017 | 12/21/2017 | P | PART |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by ron spen cer 3 walls marked on contractor print will be left open due to meeting rooms will require floor receptacles as per NEC 210.71. 2 meeting rooms large enough needed 2 floor receptacles. Will call for inspection for these 3 walls when ready. Rest of walls and hard lids rough in ok cover.
|
Application received | | | 11/27/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/27/2017 | | DONE |
|
|
|
|
First Notice | 3/19/2018 | 3/19/2018 | | | |
James Ady
|
|
|
|