Final | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | PASS |
Mark Moncarr
|
|
|
Please call 30 minutes before getting, home is occupied. Call builder. Van at ###-#### Phone #: ###-#### Inspection requested via web by Dustin Kuester Ok final. I talked to Dustin at rough-in stage. Existing garage was torn down and a new garage contructed. Existng garage was fed with a 10-2 UF. The only way to get 2 seperate circuits to garage was to saw cut through concrete patio all the way to new garage. I didnt require seperate circuits do to the cost. Lights and recepts are together. Everything is GFI protected.
|
Electrical Rough-In | 2/7/2018 | 2/8/2018 | 2/8/2018 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Kuester Ok cover garage.
|
Issue PAID IN FULL permit | | | 2/7/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/7/2018 | | DONE |
|
|
|
This permit was created on the web by Dustin Kuester
|