Final | 6/20/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
James Ady
|
|
|
Graham Phone #: ###-#### All corrections made final ok
|
Final | 5/29/2019 | 5/31/2019 | 5/31/2019 | A | FAIL |
James Ady
|
|
|
Graham Phone #: ###-#### Corrections have not been completed. GFCI in hall not functioning, Island receps not GFCI protected, counter recep rt of cooktop not protected
|
Final | 4/19/2019 | 4/26/2019 | 4/26/2019 | A | FAIL |
Mark Moncarr
|
|
|
Graham Phone #: ###-#### 1. GFI protection needed for down kitchen countertops and island. 2. GFI protection needed for second bath. 3. There is no DW as of now, but it will be cord and plug connected under sink.
|
Final | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | CANC |
James Ady
|
|
|
Graham Phone #: ###-####
|
Electrical Rough-In | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | PASS |
James Ady
|
|
|
John will be there today. 2nd number Graham--###-#### Phone #: ###-#### original layout changed. Down kitchen ok to cover
|
Final | 6/22/2018 | 6/22/2018 | 6/22/2018 | P | NR |
Daryl DeGrange
|
|
|
Graham--need inspectrion as late as possible Phone #: ###-#### conference was needed
|
Conference | 6/22/2018 | 6/23/2018 | 6/22/2018 | P | DONE |
Daryl DeGrange
|
|
|
Graham--need inspectrion as late as possible Phone #: ###-#### Discussed with homeowner required counter outlet spacing, box fill, small appliance circuits- no other outlets
|
Electrical Rough-In | 3/19/2018 | 3/20/2018 | 3/20/2018 | A | PASS |
James Ady
|
|
|
Please call ahead for access - John Phone #: ###-#### Basement only ok to cover
|
Conference | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | DONE |
James Ady
|
|
|
Tammy-wife Phone #: ###-#### Basement kitchen, Bath and hall Project. Talked about box fill, Kitchen recep spacing, Circuits required, Tamper resistant receps and smoke detectors.
|
Issue PAID IN FULL permit | | | 2/10/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/10/2018 | | DONE |
|
|
|
This permit was created on the web by Tammy Hill
|