Final | 5/2/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Tom Saunders
|
|
|
Any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller...ok to final
|
Electrical Rough-In | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Any questions please call Jordan @ ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller 300.4- MC cable shall not be secured with in 1 1/4" from framing surface. 314.23- Junction boxes shall be securely mounted in place. 314.29- Boxes shall be accessible. Boxes above hardlid shall have an access panel or be relocated. 330.30- MC cable shall be secured with in 12" of a box.
|
Electrical Rough-In | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Eric Story
|
|
|
Any questions please call Louis @ ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Correction fixed rough-in bathroom ok to cover
|
Electrical Rough-In | 2/27/2018 | 2/28/2018 | 2/28/2018 | A | FAIL |
Daryl DeGrange
|
|
|
Any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Nail plates, secure and support MC, ,j- box above hard lid shall be accessable, Ground metal boxes, shall not install MC inside 2x4 steel framing member
|
Issue PAID IN FULL permit | | | 2/20/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 2/20/2018 | | |
|
|
|
|
Application received | | | 2/20/2018 | | DONE |
|
|
|
This permit was created on the web by Louis Keller
|
First Notice | 5/7/2018 | 5/7/2018 | | | |
Tom Saunders
|
|
|
|