Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberELE18-01167
StatusFinaled
Name 45TH PARALLEL ELECTRIC LLC
Site Address 1320 N HARTMAN ST Unit: H-1
Project Name 
Customer Number33033
ePlanReviewNo
Description
Alteration or Repair: electrical rewire after fire, Building H units 1,2,3,4,5,6,8 (unit 7 had no electrical damage or repair and is located on the lower south corner)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/11/20187/12/20187/12/2018APASS
DetailsTom Saunders
Building H, access 6935 Phone #: ###-#### Inspection requested via web by David Nelson...coprrections made...ok to final
Final7/11/20187/11/20187/11/2018PFAIL
DetailsTom Saunders
access 6935 Phone #: ###-#### Inspection requested via web by David Nelson...
unit 1..abrasion protection needs added for romex at bedroom heaters
unit 2..romex protection-heaters
outlets shall not be installed above heater
unit 3..romex protection-heaters
outlets shall not be installed above heater
unit 4 romex protection-heaters
outlets shall not be installed above heater
unit 5..abrasion protection for romex living heater
unit 6..patio light not working
romex protection-heaters
unit 7..living rm heater-junction cover
kitchen outlets need to be completed
panel needs labelled completely
unit 8..panel needs labelled completely
Rough-In Permanent Service3/29/20183/29/20183/29/2018PPASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by David Nelson...rough ok to cover...p/s, u/g, 2 meter packs, 9 meters, new feeds from transformer needed
Rough-In Permanent Service3/27/20183/28/20183/28/2018AFAIL
DetailsTom Saunders
electrical rewire after fire, building H units 1,2,3,4,5,6,8 Phone #: ###-#### Inspection requested via web by David Nelson...

H8-wires need stapled 1 1/4 back fromface of stud where sheetrock cut out, nail plates at panel
H6- bushing on pipe with feeder wires
H5- nail plates in ceiling
H2- finish wiring for outside light, misc outlets need made up, wires need stapled 1 1/4 back from face of stud 12/2 living rm
H3- exhaust fan wiring needs completed in bath
nail plates needed on sub feed at panel

listed connector at service going from PVC to HUB...both meter packs
Issue PAID IN FULL permit  3/27/2018 DONE
Payment received via Govolutions
Application received  3/27/2018 DONE
This permit was created on the web by David Nelson
First Notice7/12/20187/12/2018   
DetailsTom Saunders