Final | 7/9/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Mark Moncarr
|
|
|
Pls contact Brad (Foreman) @ 208-713.3353 or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Homeowner respectfully requests 12pm to 1pm to align with her Lunch hour, if at all possible. Thank you. Inspection requested via web by Rob Maes Ok final.
|
Final | 7/9/2018 | 7/9/2018 | 7/9/2018 | A | FAIL |
Eric Story
|
|
|
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes No one home and will add a re-inspect fee if no is there on next trip....
|
Final | 7/3/2018 | 7/6/2018 | 7/6/2018 | A | CANC |
Eric Story
|
|
|
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes No one on site
|
Electrical Rough-In | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | PASS |
Eric Story
|
|
|
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes Verified U/L listing of solar array system and u/g from shop to house
|
Electrical Rough-In | 6/29/2018 | 7/2/2018 | 7/2/2018 | P | CANC |
Rock A. Hudson
|
|
|
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes Solar panels not on site will recall when ready as per conversation with Preston.
|
Conference | 6/25/2018 | 7/2/2018 | 7/2/2018 | A | DONE |
Rock A. Hudson
|
|
|
Please call Preston (Electrician) @ ###-#### one hr prior to arrival to meet you onsite for consultation. Thank you. Inspection requested via web by Rob Maes Discussed service change associated with solar installation. To install 200 amp meter main with breaker spaces and use feed thru lugs to sub feed house underground and to refeed shop. Will drive shaop ground rods to flush with grade and install full grounding electrode system at house, metal unserground water pipe if available and 1 ground rod or 2 ground rods. Solar to remain as designed.
|
Electrical Rough-In | 5/25/2018 | 5/29/2018 | 5/29/2018 | P | CANC |
Tom Saunders
|
|
|
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes...job will be rescheduled do to changes in solar design
|
Issue PAID IN FULL permit | | | 4/3/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/3/2018 | | DONE |
|
|
|
This permit was created on the web by Rob Maes
|