Final | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Tom Saunders
|
|
|
Thank you! Have a great day! Darryn Phone #: ###-#### Inspection requested via web by Darryn Coburn...corrections made...ok to final
|
Final | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn 110.3- Receptacle outlet located on 3rd column from front east side not working. 210.8(B)(5)- All receptacles 50a or less single phase and 100a 3 phase located with in 6' of a sink shall have GFCI protection. Dryer. 314.20- Boxes mounted in a combustible material shall be flush or have an extension ring installed. Display case receptacle outlet. 422.5(A)(2)- All receptacle outlets suppying water coolers shall have GFCI protection. Unable to locate GFCI device.
|
Electrical Rough-In | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
James Ady
|
|
|
his request is for a ceiling grid inspection. Thanks! Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Darryn Coburn corrections made rough in ok
|
Electrical Rough-In | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | FAIL |
James Ady
|
|
|
This request is for a ceiling grid inspection. Thanks! Phone #: ###-#### Inspection requested via web by Darryn Coburn Open J Box above IT room door. Missing KO seal along East wall in front room.
|
Rough-In Permanent Service | 4/27/2018 | 4/30/2018 | 4/30/2018 | P | CANC |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn
|
Electrical Rough-In | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Walls and hard lid through out rough in ok
|
Issue PAID IN FULL permit | | | 4/11/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 4/11/2018 | | |
|
|
|
|
Application received | | | 4/11/2018 | | DONE |
|
|
|
This permit was created on the web by Darryn Coburn
|
First Notice | 6/21/2018 | 6/21/2018 | | | |
Tom Saunders
|
|
|
|