Final | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | PASS |
James Ady
|
|
|
Please call Toby for re-inspection of B27 fitness/health center. Early AM preferred.
Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Corrections made Final ok
|
Final | 6/13/2018 | 6/14/2018 | 6/14/2018 | P | PART |
James Ady
|
|
|
Please call Toby for final inspection of B27 fitness and health center. As close to 2PM as possible please.
Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo TV receps by treadmill dead. Partial final ok
|
Electrical Rough-In | 5/16/2018 | 5/17/2018 | 5/17/2018 | A | PASS |
James Ady
|
|
|
Ceiling Inspection for cover Contact Pierre Elskamp Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Locker room ceiling only ok to cover
|
Electrical Rough-In | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
James Ady
|
|
|
Rough in inspection in aerobic area Contact Pierre Elskamp Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Surface mounted conduits only rough in ok
|
Electrical Rough-In | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | CANC |
James Ady
|
|
|
Call Rafael for questions. Underground inspection of area A and electrical room 103. Phone #: ###-#### Inspection requested via web by Rafael Castillo wrong permit called in
|
Issue PAID IN FULL permit | | | 4/25/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 4/25/2018 | | |
|
|
|
|
Application received | | | 4/25/2018 | | DONE |
|
|
|
This permit was created on the web by Cathy Duchek
|
First Notice | 6/15/2018 | 6/15/2018 | | | |
James Ady
|
|
|
|