Final | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PASS |
Daryl DeGrange
|
|
|
job complete, final ok
|
Conference | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PASS |
Daryl DeGrange
|
|
|
Have made some of the suggested changes, but want to get on same page with City. Preferably after 2pm. Have one quick question I would love to discuss that could possibly be resolved with a phone call. Requesting Tom Saunders, if not available its important that who does respond provide a 1 hour heads up. Thanks. Phone #: ###-#### Inspection requested via web by Cameron Craven Discussed correction notice.
|
Final | 9/23/2018 | 9/24/2018 | 9/24/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Cameron Craven 210.8- All garage and accessory building receptacle outlets shall have GFCI protection. Garage door opener receptacle and shed receptacles. GFCI device must be installed below 6'7". 225.30- All accessory shall have a disconnecting means installed to disconnect all power in that structure. Shed needs a disconnecting means.
|
Electrical Rough-In | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Tom Saunders
|
|
|
Requesting inspection of rough-in wiring work in shop prior to final and cover. Phone #: ###-#### Inspection requested via web by Cameron Craven...rough ok to cover...check at final neutrals and grounds seperated at shop panel
|
Electrical Rough-In | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PASS |
Tom Saunders
|
|
|
underground trenching - Cameron Phone #: ###-####...pipe from existing disconnect to feed new shop...ok to cover
|
Conference | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | PASS |
Tom Saunders
|
|
|
Request late morning, around 11 - Cameron Phone #: ###-####...power to shop off existing 40A circuit...will be removing one circuit and rewiring power to existing shed...uffer ground in stem wall with pipe feed ok...homeowner knowledgeable and pamphlet given...discussed all requirements for wiring
|
Fees Due Hold | 4/26/2018 | | 4/26/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/25/2018 | | DONE |
|
|
|
This permit was created on the web by Cameron Craven
|