Final | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PASS |
Eric Story
|
|
|
call 20 mins ahead-Aaron Phone #: ###-#### Final ok
|
Final | 9/27/2018 | 9/28/2018 | 9/28/2018 | A | FAIL |
Eric Story
|
|
|
Aaron Phone #: ###-#### Arc Fault protection for all bedrooms required
|
Electrical Rough-In | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Tom Saunders
|
|
|
Aaron Phone #: ###-####...corrections made...ok to cover
|
Electrical Rough-In | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | FAIL |
Tom Saunders
|
|
|
Ron Phone #: ###-####... some corrections were completed...remaining
1. complete all make up to ceiling boxes and install exhaust fans with connector 2. seperate bathrooms from same circuit...outlets only can be tied together in bathrooms...put lighting for each bathroom on nearest circuit 3. veify smoke detector hard wiring and where need added..Ron will discuss with building inspector
|
Electrical Rough-In | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Ron Phone #: ###-#### 4-05-16- Home owners exemption requires owner to perform work. Friend helping at time of inspection.
110.14- All make up shall be complete, grounds and neutrals.
240.4(D)(3)- Max over current device on 14 gauge wire 15 amps. Some switch legs in bathroom pulled in 14 ga.
300.4- Nail plate where bored hole does not maintain 1 1/4" from framing surface. 300.14- a minimum of 6" of useable wire shall be available at each box.
|
Electrical Rough-In | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | CANC |
Eric Story
|
|
|
Please call ahead for access - Ron Phone #: ###-#### Will do a conference
|
Electrical Rough-In | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | CANC |
Eric Story
|
|
|
Ron Phone #: ###-#### Not ready
|
Conference | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | CANC |
Eric Story
|
|
|
Ron Phone #: ###-####-Ron said you've already been there so if you don't go out can you please call him No conference neded at this time due to faming not complete just foundation walls are complete.
|
Application received | | | 5/8/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/8/2018 | | DONE |
|
|
|
|