First Notice | 5/6/2019 | 5/6/2019 | 5/29/2020 | | DONE |
Daryl DeGrange
|
|
|
This permit finaled on the web by Tim Dunlop
|
Final | 5/6/2019 | 5/6/2019 | 5/6/2019 | A | PASS |
Daryl DeGrange
|
|
|
Job complete, Final ok
|
Electrical Rough-In | 2/4/2019 | 2/7/2019 | 2/6/2019 | P | CANC |
Tom Saunders
|
|
|
LED wallpacks and poles. I can email cutsheets if needed. all DLC/UL/ETL Phone #: ###-#### >> Inspection requested via web by Tim Dunlop Inspection cancelled from web by: Tim Dunlop
|
Electrical Rough-In | 6/13/2018 | 6/15/2018 | 6/15/2018 | A | PASS |
Tom Saunders
|
|
|
rough in led Phone #: ###-#### Inspection requested via web by Tim Dunlop...UL listed replacement lamps and fixtures verified
|
Issue PAID IN FULL permit | | | 6/13/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/13/2018 | | DONE |
|
|
|
This permit was created on the web by Tim Dunlop
|