Final | 8/8/2018 | 8/9/2018 | 8/9/2018 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Tarter Job complete, Final ok
|
Permanent Service | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Rock A. Hudson
|
|
|
Contact to verify available fault current reating of main fuses. Due to I have not seen one under 100k will pass. p/s u/g rec ok
|
Conference | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | DONE |
Rock A. Hudson
|
|
|
Please call Brandon Sailors a call 30 minutes prior to anticipated arrival time. THANKS Phone #: ###-#### Inspection requested via web by Kelly Tarter Discussed requirements for changing or refeeding services all changing from overhead to underground. Each service shall have a permit. Grounding electrode system shall be installed on each service. Available fault current shall posted prior to inspections, at least provide AFC value to ensure main breakers cover value. Not needed on services with no changes. All bonding shall be complete if needed. Some have IMC service risers and metallic nipples being installed. Inspections will not need after hours inspections. Contractor to have all grounding electrodes in place, and will confirm bonding if needed on final. Some services to be reconnected with no changes needed.
|
Issue PAID IN FULL permit | | | 6/14/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/14/2018 | | DONE |
|
|
|
This permit was created on the web by Kelly Tarter
|
First Notice | 8/9/2018 | 8/9/2018 | | | |
Daryl DeGrange
|
|
|
|