Final | 9/14/2018 | 10/1/2018 | 10/1/2018 | P | DONE |
Rock A. Hudson
|
|
|
Check if hot tub installed in violation of NEC and permitting. Job finaled. Unable to verify without trespassing on some properties. As of final date hot tub had not been installed.
|
Final | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | PASS |
Rock A. Hudson
|
|
|
Garage code 7573 Phone #: ###-#### Inspection requested via web by Bob Glenn Will check back in future to ensure hot tub has not been installed in areas in violation of NEC. Final ok
|
Final | 9/13/2018 | 9/13/2018 | 9/13/2018 | P | FAIL |
Daryl DeGrange
|
|
|
573 2300 Inspection requested via web by Bob Glenn NEC 210.12 AFCI protection for master bedroom not holding. Branch circuit provided for future Hot Tub- (Hot tub not on site) Proposed location for future Hot Tub would be in violation of NEC 680.9 Overhead Service Conductor NEC Clearances. Contractor has advised homeowner of life safety risk.
|
Electrical Rough-In | 8/20/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Eric Story
|
|
|
Rough in for the floor in the master bathroom . The window next to the front door is open Phone #: ###-#### Inspection requested via web by Bob Glenn Master floor heat ok to cover
|
Rough-In Permanent Service | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn Wire coiled wall next to fireplace and for floor receptacle in basement ceiling center bed near smoke. Attic boxes associated with furnace trimmed at rough in. Rough in ok cover p/s o/h n ok
|
Issue PAID IN FULL permit | | | 6/14/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/14/2018 | | DONE |
|
|
|
This permit was created on the web by Bob Glenn
|