Final | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot final ok
|
Electrical Rough-In | 7/12/2018 | 7/12/2018 | 7/12/2018 | P | PASS |
James Ady
|
|
|
Reinspect floor heat Phone #: ###-#### Inspection requested via web by Barbara Szurgot correction made floor heat only ok to cover
|
Electrical Rough-In | 7/6/2018 | 7/9/2018 | 7/9/2018 | A | FAIL |
James Ady
|
|
|
Floor heat inspection. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Floor heat splice shall be embedded in tile as per manufacturer instructions
|
Rough-In Permanent Service | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Rock A. Hudson
|
|
|
Bath rough in. Floor heat not done yet. Phone #: ###-#### Inspection requested via web by Barbara Szurgot 210.11- Bathroom receptacles shall be on a dedicated 20 amp circuit. Wiring has to be fished in. Called contractor who stated they were ok if allowed to cover and the 20 amp requirement will be checked at final. 2 bathrooms rough in ok cover
|
Issue PAID IN FULL permit | | | 6/20/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/20/2018 | | DONE |
|
|
|
This permit was created on the web by Barbara Szurgot
|