Final | 7/2/2018 | 7/2/2018 | 7/2/2018 | P | PASS |
Rock A. Hudson
|
|
|
Gorka-please call 15 mins Phone #: ###-#### Final ok
|
Permanent Service | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Tom Saunders
|
|
|
reenergize...p/s o/h reconnect ok
will verify grounding of water pipe at time of final..given wrong size wire at store...no eddison circuits...verify labelling at final
|
Conference | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | DONE |
Rock A. Hudson
|
|
|
Corka--please call 20 mins before Phone #: ###-#### Discussed service change to 200 amps. Shall provide 3' from operable windows, size of service entrance conductors, grounding electrode system to include metal underground water pipe if water main is still metal. Owner felt addition of breakers equalled 390 amps of power being used. Informed how service calculations are done and encouraged to test amperage under heavy load to see what actual draw is.
|
Issue PAID IN FULL permit | | | 6/22/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/22/2018 | | DONE |
|
|
|
This permit was created on the web by Gorka Legarreta
|