Final | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PASS |
Mark Moncarr
|
|
|
Inspection requested via web by Petros Paflias Ok final. All TR installed in office area and outside WP's.
|
Final | 7/3/2019 | 7/8/2019 | 7/8/2019 | A | NR |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Petros Paflias
|
Electrical Rough-In | 9/20/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Mark Moncarr
|
|
|
Need to recheck electrical sockets for wire nuts on ground wires. Phone #: ###-#### Inspection requested via web by Petros Paflias Ok cover office. Corrections fixed. Will look at bonding jumper in panel on final. Extra ground bar was added to bottom left of panel. Bonding jumper needed to tie new ground bar to existing.
|
Final | 9/9/2018 | 9/11/2018 | 9/11/2018 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Petros Paflias This is not a final. I added a RI inspection for addition. RI has corrections that need to be made.
|
Electrical Rough-In | 9/11/2018 | 9/11/2018 | 9/11/2018 | A | FAIL |
Mark Moncarr
|
|
|
###-#### 1. #14 wire cannot be mixed with #12 wire. 2. All boxes need grounds tied together with 1 pigtail out for device. 3. Some wires need to be re-located to center of stub. Need to be 1-1/4" away from face of stub. 4. New ground bar added in lower right of panel. Grounds and neutrals need to stay tied together as this is a main service. Add a ground wire jumper from new ground bar to existing ground bar.
|
Issue PAID IN FULL permit | | | 6/27/2018 | | DONE |
|
|
|
|
Application received | | | 6/24/2018 | | DONE |
|
|
|
This permit was created on the web by Petros Paflias
|