Final | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot...ok
|
Final | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | FAIL |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot... 1..exterior fixtures on front of garage shall be verified to be wall mounted and damp location rated...110.3
2..back light fixture shall be mounted flush to wall..exposed wiring..110.3
|
Electrical Rough-In | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot...
ok to cover walls of garage
By final the 10/2 and 12/2 HRs to outside panel need fixed-romex ran in sealtite and 1 1/2 conduit stubbed into exterior panel with a 10/3 and 8 or 6/3 romex in it shall also be brough up to code- romex is not rated to be ran outside
verification of other HR locations needed by final
|
Issue PAID IN FULL permit | | | 7/2/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/2/2018 | | DONE |
|
|
|
This permit was created on the web by Barbara Szurgot
|