Final | 6/7/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Tom Saunders
|
|
|
final out shop....work was taken over by different electrical contractor under permit 18-03983
|
Final | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | FAIL |
Tom Saunders
|
|
|
Ready for re-inspect of industrial equipment Phone #: ###-#### Inspection requested via web by Paula Gratiot... 1..correct breaker for compressor needs installed-3 phase 2..supports need added to compressor feeds 3..junction box at laser needs addressed-bonded, blank, and KO seal 3..paint booth breaker needs labeled and verified correct size-paper work on booth 4..relocated panel needs labelling completed 5..new drops at poles need GFI protection 110 and 220 up to 50A 6..Boise City ordinance-no violation shall be retaind...visible code violations need fixed-existing panels need labelling, KOs need installed at multiple locations, GFI protection in existing 110 outlets
|
Final | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | NR |
Tom Saunders
|
|
|
Electrical final of industrial equipment Phone #: ###-#### Inspection requested via web by Paula Gratiot...will reschedule when can meet and go over scope of work
|
Issue PAID IN FULL permit | | | 7/3/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/3/2018 | | DONE |
|
|
|
This permit was created on the web by Paula Gratiot
|
First Notice | 6/7/2019 | 6/7/2019 | | | |
Tom Saunders
|
|
|
|