Final | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot...ok to final
|
Electrical Rough-In | 10/10/2018 | 10/11/2018 | 10/11/2018 | A | PASS |
Tom Saunders
|
|
|
Floor heat inspection for cover. Back slider door is open, and the addition is not connected into existing home. Phone #: ###-#### Inspection requested via web by Barbara Szurgot tile heat ok to cover
|
Rough-In Permanent Service | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot.... corrections made...verify junction box in ceiling for sub feeds at final as well as panel inside is made into a sub panel...heated tile floor will need seperate rough in inspection... p/s u/g ok to connect...being relocated
|
Rough-In Permanent Service | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | FAIL |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot...
1..service shall have supplemental ground rod 6ft apart...250.53...meet 2008 NEC code
2..breaker supplying future sub panel too large for busing in new meter base/panel..manufacturers rating...70A max..110.3
3.. NMC shall not be stapled on edge...multiple locations..334.30 4..intersystem bond bar shall be installed by final
|
Telephone call | | | 8/14/2018 | | DONE |
|
|
|
per phone call from Barbara from Szurgot Elec. add radiant floor heat to permit
|
Issue PAID IN FULL permit | | | 8/9/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/9/2018 | | DONE |
|
|
|
This permit was created on the web by Barbara Szurgot
|