Final | 9/24/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
Eric Story
|
|
|
an addition to an existing solar system is done and ready for final.
approved plans are on site at the solar disconnect.
Please give the customer a call a head of time to get access.
The meter, solar disconnect and solar combiner are outside/exterior; but the panel that the solar circuit is landed on is down stairs in basement. The raceway in basement is exposed and visible.
Give me a call if you have any questions at 850.8965
Thanks guys, Ryan King Phone #: ###-#### Inspection requested via web by Ryan King Final ok
|
Final | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PART |
Eric Story
|
|
|
solar addition to existing system is complete, according to plans, and ready for inspection. Approved plans on site, located at the meter. Give the customer a call a head of time for access to the basement. Other than that, it''s a easy one; Enphase micro inverter system. Give me a call if you have any questions at all. Thanks guys, Ryan King Phone #: ###-#### Inspection requested via web by Ryan King Final ok for solar array system
|
Electrical Rough-In | 9/4/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Eric Story
|
|
|
listing inspection for solar panels and micro inverters. Phone #: ###-#### Inspection requested via web by Ryan King Solar parts listed and scope of work is fine
|
Issue PAID IN FULL permit | | | 8/23/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/23/2018 | | DONE |
|
|
|
This permit was created on the web by Ryan King
|