First Notice | 8/2/2019 | 8/2/2019 | 12/2/2019 | | DONE |
Tom Saunders
|
|
|
This permit finaled on the web by Scott Campbell
|
Final | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####... complete...ok to final card signed
|
Electrical Rough-In | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Tom Saunders
|
|
|
Zach Phone #: ###-####...heat tap exterior building...ok to cover
|
Final | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | PART |
Tom Saunders
|
|
|
Zach Phone #: ###-####... TCO of building interior ok remaining work outside...heat trace circuit and material install-requiring inspections sign wall missing 1 light
|
Final | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | PART |
Tom Saunders
|
|
|
Zack- interior inspection Phone #: ###-####... interior complete, roof top complete...exterior perimeter of building and oxygen room remaining for complete final
|
Electrical Rough-In | 7/16/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Tom Saunders
|
|
|
Zack- inspection Electrical, Dat, and roof Phone #: ###-####....areas stated above inspected for completion
|
Final | 7/15/2019 | 7/16/2019 | 7/16/2019 | P | FAIL |
Tom Saunders
|
|
|
Zack- Area 4 Phone #: ###-####... area not complete...practice kitchen not complete
|
Final | 7/10/2019 | 7/11/2019 | 7/11/2019 | P | NR |
Tom Saunders
|
|
|
column line 16 to 11 (therapy gym and kitchen) // Zach Phone #: ###-####...changed to rough inspection to keep permit open
|
Electrical Rough-In | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Tom Saunders
|
|
|
column line 16 to 11 (therapy gym and kitchen) // Zach Phone #: ###-####...areas marked as complete for occupency...missing GFCIs verified next inspection
|
Final | 7/9/2019 | 7/10/2019 | 7/10/2019 | P | NR |
Tom Saunders
|
|
|
Zack- inspection for admond area Phone #: ###-####... areas checked off in rough inspection...see notes
|
Electrical Rough-In | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Tom Saunders
|
|
|
Zack- inspection for admond area Phone #: ###-####...areas approved as finaled...Admin up to line 16 ok to occupy
|
Electrical Rough-In | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####... Area C and D patient rms. nurses station complete
|
Final | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | CANC |
Tom Saunders
|
|
|
area A and B - Zack Phone #: ###-####.. see rough in notes...verified areas
|
Electrical Rough-In | 6/28/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Tom Saunders
|
|
|
area A and B - Zack Phone #: ###-####... patient rms, hallway, and pharmacy verified ok
|
Electrical Rough-In | 6/13/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####... grid complete...ok to final
|
Electrical Rough-In | 6/6/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####.... Area3 grid ok line 16 up to 11
|
Electrical Rough-In | 5/31/2019 | 6/3/2019 | 6/3/2019 | A | PASS |
Tom Saunders
|
|
|
above ceiling - Zach Phone #: ###-####... Area 3 up to line 16 grid ok to cover
|
Electrical Rough-In | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Eric Story
|
|
|
above ceiling // Zach Phone #: ###-#### Ceilings as noted on print ok to cover
|
Electrical Rough-In | 4/29/2019 | 4/29/2019 | 4/29/2019 | P | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####... area4 walls...walls complete
|
Rough-In Permanent Service | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####... area 1 ceilings and area 3 bath hardlids
|
Temporary Service | 4/10/2019 | 4/11/2019 | 4/11/2019 | P | CANC |
Tom Saunders
|
|
|
main switch gear // Zach Phone #: ###-#### wrong inspection
|
Permanent Service | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | PASS |
Tom Saunders
|
|
|
main switch gear // Zach Phone #: ###-#### ok to switch meter to main switch gear to power temp power skid...another rough inspection is required to power future panels and transformers meter at transformer now...ok
|
Electrical Rough-In | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####... Area 1 patient rm grid and hallway perimeter tiles discussed small perimeter no full tiles
|
Electrical Rough-In | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PASS |
Eric Story
|
|
|
Zach Phone #: ###-#### Lobby and entry hard lids and walls as noted on print ok to cover
|
Electrical Rough-In | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####... hard lid area 2
|
Electrical Rough-In | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
Tom Saunders
|
|
|
Zach Phone #: ###-####... walls section E and partial G...marked plans
|
Electrical Rough-In | 3/8/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####... Area E admin...as marked on plans
|
Electrical Rough-In | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####... Area A hard lids bathroom, ambulance canopy, and entry ok to cover
|
Electrical Rough-In | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Eric Story
|
|
|
Zack Phone #: ###-#### Walls as noted on print ok to cover
|
Electrical Rough-In | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | PASS |
Tom Saunders
|
|
|
Zach...###-####... wall cover area C marked on plans minus pony walls nurses station
|
Electrical Rough-In | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | CANC |
Tom Saunders
|
|
|
Zack Phone #: ###-####... oked by contractor to reschedule to next day AM
|
Electrical Rough-In | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Tom Saunders
|
|
|
Zack Phone #: ###-####... walls ok to cover...area B as marked on plans
|
Electrical Rough-In | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PASS |
Tom Saunders
|
|
|
Zach Phone #: ###-####... 10 rms as marked on plans
|
Temporary Service | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | CANC |
Tom Saunders
|
|
|
Zach Phone #: ###-#### Inspection cancelled from web by: Scott Campbell
|
Electrical Rough-In | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Tom Saunders
|
|
|
Zach Phone #: ###-####... underground for main electrical rm discussed city stamped plans on job and wiring to engineers specs...1 change they requesting is use of #10 stranded instead of solid -requirement in notes-will get engineer sign off
|
Electrical Rough-In | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Tom Saunders
|
|
|
Underground/cover - Zach Phone #: ###-####...utillity feeds into electrical rm ok to cover
|
Electrical Rough-In | 10/11/2018 | 10/12/2018 | 10/12/2018 | A | PASS |
Tom Saunders
|
|
|
underground // Zack Phone #: ###-####...ok to cover...East end-zone A section 1
|
Electrical Rough-In | 10/4/2018 | 10/5/2018 | 10/5/2018 | A | PASS |
Rock A. Hudson
|
|
|
Zack-underground Phone #: ###-#### Service entrance conduits modified offsets around drainage to gradual sweeps and a direct line to west electrical room. Service entrance underground thru court yard rough in ok cover
|
Electrical Rough-In | 9/27/2018 | 9/28/2018 | 9/28/2018 | A | PASS |
Rock A. Hudson
|
|
|
underground // Zack Phone #: ###-#### Discussed issue of more than 360 degrees of bends in underground feeds for east main electrical room. 1 turning up in east electrical room, 1 turning west mid point, than noticed trench has 2 offsets around drainage. At this point a total of 360 degrees will be in conduit run. Zack has presented issue to general contractor and waiting for responce. East electrical room underground rough in ok cover.
|
Electrical Rough-In | 9/24/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
James Ady
|
|
|
underground- Zach Phone #: ###-#### SE corner bus duct ok to cover
|
Conference | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Rock A. Hudson
|
|
|
Zack Phone #: ###-#### Contact wanted to touch base with inspector to discuss code changes that may affect rehab hospital. Informed of conference rooms, commercial kitchens GFCI protection, type of receptacles for waiting rooms, corridors ect. Duct bank being installed with listed ladder system. OK to back fill areas needed for traffic areas.
|
Issue PAID IN FULL permit | | | 9/11/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/11/2018 | | DONE |
|
|
|
This permit was created on the web by Scott Campbell
|