Final | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | PASS |
Mark Moncarr
|
|
|
Doug Phone #: ###-#### Ok final.
|
Final | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | NR |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot
|
Final | 12/23/2018 | 12/24/2018 | 12/24/2018 | A | NH |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot no access
|
Rough-In Permanent Service | 10/17/2018 | 10/18/2018 | 10/19/2018 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot p/s o/h n ok. Overhead mast was above 6' requirement for IDP. IDP had contractor lower mast height to no more than 6' above rooftop. Overhead drop does go across backside of roof.
|
Electrical Rough-In | 10/17/2018 | 10/18/2018 | 10/17/2018 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot Inspection cancelled from web by: Barbara Szurgot
|
Issue PAID IN FULL permit | | | 10/11/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/11/2018 | | DONE |
|
|
|
This permit was created on the web by Barbara Szurgot
|