Final | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Rock A. Hudson
|
|
|
Dale Phone #: ###-#### Final ok
|
Electrical Rough-In | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Rock A. Hudson
|
|
|
Dale Phone #: ###-#### Installation circuit for 11 additional solar panels to new communication hub for new enphase inverters. Rough in ok.
|
Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | CANC |
James Ady
|
|
|
still changing out the main breaker and need something from you to reconnect Phone #: ###-#### Inspection requested via web by Andy Derrick Needed perm serv
|
Permanent Service | 10/24/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
James Ady
|
|
|
still changing out the main breaker and need something from you to reconnect Phone #: ###-#### Inspection requested via web by Andy Derrick Breaker changed from 200A to 175A. p/s u/g rec ok
|
Final | 10/22/2018 | 10/24/2018 | 10/23/2018 | A | FAIL |
James Ady
|
|
|
Idaho Power will pull the meter at 9am so I can change the main breaker. It won''t take me long (20 minutes) and I''ll be leaving. Everything else is done now. Idaho Power might hang out and re-energize without your sticker, depends on the guy. Phone #: ###-#### Inspection requested via web by Andy Derrick No ispections done on solar array. No permit covering electrical from array.
|
Issue PAID IN FULL permit | | | 10/22/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/22/2018 | | DONE |
|
|
|
This permit was created on the web by Andy Derrick
|