Final | 9/23/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Eric Story
|
|
|
Call for access-Dustin Phone #: ###-#### Bath and closet final ok
|
Electrical Rough-In | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | PASS |
Rock A. Hudson
|
|
|
Dusty Phone #: ###-#### Corrections complete. bathroom rough in ok cover
|
Electrical Rough-In | 2/20/2019 | 2/20/2019 | 2/20/2019 | P | FAIL |
Daryl DeGrange
|
|
|
Call ahead // Dustin Phone #: ###-#### NEC 210.52 Need receptacle behind master bedroom door, nail plates where required.
|
Conference | 11/26/2018 | 11/30/2018 | 11/30/2018 | A | DONE |
Eric Story
|
|
|
call when your on your way- Dustin Phone #: ###-#### Discussed wiring for master bath and closet, owner is aware of all code and requirements for this install..
|
Application received | | | 11/23/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/23/2018 | | DONE |
|
|
|
|