Electrical Rough-In | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PASS |
Mark Moncarr
|
|
|
screened // Lloyd Phone #: ###-#### Ok cover closet in basement.
|
Fees Due Hold | 1/18/2019 | | 1/22/2019 | | DONE |
|
|
|
|
Electrical Rough-In | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | PASS |
Mark Moncarr
|
|
|
Lloyd ###-#### Homeowner. Ok cover ceiling, and all other walls except where work is being done. 10/3 junction point to left of utility door needs open for inspection.
|
Conference | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | DONE |
Mark Moncarr
|
|
|
Lloyd Phone #: ###-#### Discussed required outlets needed after closet is built. 10/3 UF spiced in wall left of door going into utility. Needs to be open upon RI inspection to verify correct junction or removal of wire. Also discussed load calc since adding 30a mini split circuit. Panel is full.
|
Issue PAID IN FULL permit | | | 1/17/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Telephone call | | | 1/17/2019 | | DONE |
|
|
|
spoke with Lloyd informing him he will need to send in a request for a refund on ELE19-00185. add fixture to this permit and the fee difference. informed him he would need to pay this fee since we are unable to transfer funds. Stated he should not do any more ele work until he has his confer. with inspector
|
Application received | | | 1/16/2019 | | DONE |
|
|
|
This permit was created on the web by Lloyd Pierce
|